{"title":"Dust Protection \u0026 Containment","description":"\u003cp\u003eProfessional HEYLO dust-protection walls, doors and negative-pressure systems for renovation, restoration and hazardous-substance remediation. Contain dust at the source and keep adjacent areas clean.\u003c\/p\u003e","products":[{"product_id":"heylo-heywall-basis-paket-staubschutzwand","title":"HEYLO HEYWALL Basis-Paket – Dust Protection Wall (up to 8 m \/ 28.8 m²)","description":"\u003cdiv style=\"background:#eef4fa;border:2px solid #2a6fb0;padding:12px 16px;border-radius:8px;margin:0 0 20px 0;\"\u003e\u003cp style=\"margin:0;color:#0f1923;\"\u003e\u003cstrong\u003eAvailable to order:\u003c\/strong\u003e typical lead time 5–10 working days. We confirm the exact date after your order or enquiry.\u003c\/p\u003e\u003c\/div\u003e\n\u003cp\u003eThe \u003cstrong\u003eHEYLO HEYWALL Basis-Paket\u003c\/strong\u003e is a passive dust-protection wall that seals a work zone from floor to ceiling to keep construction dust out of the rest of a building. It forms a barrier up to \u003cstrong\u003e8 m long and 28.8 m²\u003c\/strong\u003e in area, at heights up to 3.60 m (5 m with extension bars), and goes up in minutes entirely without tools — no taping, no ladders and no post-job cleaning.\u003c\/p\u003e\n\u003ch4\u003eWhat's in the set\u003c\/h4\u003e\n\u003cp\u003eTelescopic aluminium tension poles clamp vertically between floor and ceiling; protective sheeting clips into the head and foot plates and is drawn tight to form the partition, and a self-adhesive zipper cuts a resealable entrance into the barrier. Angle adaptors let you run the wall straight, or in L-, U- or polygonal shapes to enclose the work area. Everything stows in the supplied transport bag.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e4 telescopic system bars up to 3.60 m (incl. head and foot plates)\u003c\/li\u003e\n\u003cli\u003e4 angle adaptors\u003c\/li\u003e\n\u003cli\u003e2 self-adhesive zippers (220 cm)\u003c\/li\u003e\n\u003cli\u003e1 transport bag\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eKey benefits\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eTool-free set-up in minutes\u003c\/strong\u003e — telescopic poles clamp between floor and ceiling; no taping, drilling or ladders.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSeals up to 28.8 m²\u003c\/strong\u003e — one kit spans walls up to 8 m long and 3.60 m high (5 m with extension bars).\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eResealable access\u003c\/strong\u003e — self-adhesive 220 cm zippers create a working entrance you can open and close.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlexible geometry\u003c\/strong\u003e — angle adaptors form straight, L-, U- or polygonal barriers around the work zone.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eClean, reusable and portable\u003c\/strong\u003e — no adhesive residue or post-cleaning; packs into the included transport bag (12 kg).\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eTypical applications\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003eDust containment during renovation, refurbishment and restoration\u003c\/li\u003e\n\u003cli\u003eSealing off individual rooms or corridors on occupied sites\u003c\/li\u003e\n\u003cli\u003eTemporary partitions in retail, office or public buildings during works\u003c\/li\u003e\n\u003cli\u003eProtecting clean or finished areas next to a demolition or sanding zone\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eTechnical data\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eMax. wall height:\u003c\/strong\u003e 3.60 m (5 m with extension bars)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMax. wall length:\u003c\/strong\u003e 8 m · \u003cstrong\u003emax. area:\u003c\/strong\u003e 28.8 m²\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackaging:\u003c\/strong\u003e 1500 × 370 × 420 mm · \u003cstrong\u003eweight:\u003c\/strong\u003e 12 kg\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFoil (accessory):\u003c\/strong\u003e PE 100 µm, roll 50 × 4 m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eArticle no.:\u003c\/strong\u003e 1920101\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eFree shipping within Germany; B2B sales to trade, industry and public-sector buyers.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eOriginal HEYLO equipment (Dantherm Group)\u003c\/strong\u003e — supplied with full manufacturer documentation by BMB Rheinland, your authorised distribution partner.\u003c\/p\u003e\n\u003cp\u003ePlanning a project or a larger requirement? \u003ca href=\"\/pages\/contact\"\u003eRequest a quote\u003c\/a\u003e.\u003c\/p\u003e","brand":"HEYLO","offers":[{"title":"Default Title","offer_id":57799292584280,"sku":"1920101","price":296.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0962\/3932\/1432\/files\/Heylo-HEYWALL-Basis-Paket_2f36eb961623f37d75fa298e9bd01544.webp?v=1784891262"},{"product_id":"heylo-heywall-plus-paket-staubschutzwand","title":"HEYLO HEYWALL Plus-Paket – Dust Protection Wall with Sealing Rails (up to 8 m \/ 28.8 m²)","description":"\u003cdiv style=\"background:#eef4fa;border:2px solid #2a6fb0;padding:12px 16px;border-radius:8px;margin:0 0 20px 0;\"\u003e\u003cp style=\"margin:0;color:#0f1923;\"\u003e\u003cstrong\u003eAvailable to order:\u003c\/strong\u003e typical lead time 5–10 working days. We confirm the exact date after your order or enquiry.\u003c\/p\u003e\u003c\/div\u003e\n\u003cp\u003eThe \u003cstrong\u003eHEYLO HEYWALL Plus-Paket\u003c\/strong\u003e is a passive dust-protection wall for jobs with higher sealing requirements. Building on the tool-free HEYWALL system, it adds \u003cstrong\u003eside clamps and sealing rails with ceiling clamps\u003c\/strong\u003e for a tightly sealed wall and ceiling finish that contains even fine dust. It seals a work zone up to \u003cstrong\u003e8 m long and 28.8 m²\u003c\/strong\u003e in area, at heights up to 3.60 m (5 m with extension bars), and erects in minutes without tools.\u003c\/p\u003e\n\u003ch4\u003eWhat's in the set\u003c\/h4\u003e\n\u003cp\u003eTelescopic aluminium tension poles clamp vertically between floor and ceiling; protective sheeting clips into the head and foot plates and is drawn tight to form the partition. Side clamps and sealing rails with ceiling clamps press the sheeting firmly against wall and ceiling for a dust-tight edge seal, while a self-adhesive zipper provides a resealable entrance. Angle adaptors allow straight, L-, U- or polygonal layouts, and the kit stows in the supplied transport bag.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e4 telescopic system bars up to 3.60 m (incl. head and foot plates)\u003c\/li\u003e\n\u003cli\u003e4 angle adaptors\u003c\/li\u003e\n\u003cli\u003e2 self-adhesive zippers\u003c\/li\u003e\n\u003cli\u003e4 side clamps\u003c\/li\u003e\n\u003cli\u003e4 sealing rails incl. ceiling clamps\u003c\/li\u003e\n\u003cli\u003e1 transport bag\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eKey benefits\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eDust-tight edge sealing\u003c\/strong\u003e — side clamps and sealing rails with ceiling clamps press the sheeting against wall and ceiling to contain fine dust.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTool-free set-up in minutes\u003c\/strong\u003e — telescopic poles clamp between floor and ceiling; no taping, drilling or ladders.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSeals up to 28.8 m²\u003c\/strong\u003e — spans walls up to 8 m long and 3.60 m high (5 m with extension bars).\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eResealable access\u003c\/strong\u003e — self-adhesive zipper creates a working entrance you can open and close.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlexible geometry\u003c\/strong\u003e — angle adaptors form straight, L-, U- or polygonal barriers.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eClean, reusable and portable\u003c\/strong\u003e — no adhesive residue or post-cleaning; packs into the included transport bag (10 kg).\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eTypical applications\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003eDust containment during renovation and restoration where fine dust must be controlled\u003c\/li\u003e\n\u003cli\u003eSealing off rooms next to sanding, cutting or demolition work\u003c\/li\u003e\n\u003cli\u003eProtecting sensitive finished areas, clean rooms or occupied zones\u003c\/li\u003e\n\u003cli\u003ePublic-sector, healthcare and retail refurbishments with strict dust requirements\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eTechnical data\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eMax. wall height:\u003c\/strong\u003e 3.60 m (5 m with extension bars)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMax. wall length:\u003c\/strong\u003e 8 m · \u003cstrong\u003emax. area:\u003c\/strong\u003e 28.8 m²\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackaging:\u003c\/strong\u003e 1700 × 300 × 150 mm · \u003cstrong\u003eweight:\u003c\/strong\u003e 10 kg\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eArticle no.:\u003c\/strong\u003e 1920105\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eFree shipping within Germany; B2B sales to trade, industry and public-sector buyers.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eOriginal HEYLO equipment (Dantherm Group)\u003c\/strong\u003e — supplied with full manufacturer documentation by BMB Rheinland, your authorised distribution partner.\u003c\/p\u003e\n\u003cp\u003ePlanning a project or a larger requirement? \u003ca href=\"\/pages\/contact\"\u003eRequest a quote\u003c\/a\u003e.\u003c\/p\u003e","brand":"HEYLO","offers":[{"title":"Default Title","offer_id":57799292649816,"sku":"1920105","price":450.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0962\/3932\/1432\/files\/Heylo-HEYWALL-Plus-Paket_2f36eb961623f37d75fa298e9bd01544.webp?v=1784891262"},{"product_id":"heylo-heywall-profi-paket-staubschutzwand","title":"HEYLO HEYWALL Profi-Paket – Dust Protection Wall (up to 13 m \/ 46.8 m²)","description":"\u003cdiv style=\"background:#eef4fa;border:2px solid #2a6fb0;padding:12px 16px;border-radius:8px;margin:0 0 20px 0;\"\u003e\u003cp style=\"margin:0;color:#0f1923;\"\u003e\u003cstrong\u003eAvailable to order:\u003c\/strong\u003e typical lead time 5–10 working days. We confirm the exact date after your order or enquiry.\u003c\/p\u003e\u003c\/div\u003e\u003cp\u003eThe \u003cstrong\u003eHEYLO HEYWALL Profi-Paket\u003c\/strong\u003e is a large-format, reusable dust-protection wall system that partitions active work areas from occupied space. A set of six telescopic tension bars and eight ceiling-clamped sealing rails let you close off barriers of \u003cstrong\u003eup to 13 m length \/ 46.8 m²\u003c\/strong\u003e in minutes — completely tool-free.\u003c\/p\u003e\u003ch4\u003eWhat's in the set\u003c\/h4\u003e\u003cp\u003eThe system works entirely by mechanical clamping — no fan, no filter, no adhesive tape. Each telescopic bar tensions floor-to-ceiling to carry the protective sheeting, while the sealing rails and side clamps press the sheeting edges tight for a dust-proof seam. Self-adhesive zippers open a clean access slit through the barrier, and the angle adaptors let you build straight dividers, L- and U-shapes or polygons at any angle.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e6 telescopic system bars up to 3.60 m (incl. head and foot plates)\u003c\/li\u003e\n\u003cli\u003e6 angle adaptors\u003c\/li\u003e\n\u003cli\u003e2 self-adhesive zippers\u003c\/li\u003e\n\u003cli\u003e6 side clamps\u003c\/li\u003e\n\u003cli\u003e8 sealing rails incl. ceiling clamps\u003c\/li\u003e\n\u003cli\u003e3 transport bags\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eKey benefits\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eTool-free erection\u003c\/strong\u003e — telescopic clamping sets up a full-height barrier in minutes, with no drilling, taping or fixings.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLarge coverage\u003c\/strong\u003e — up to 13 m length and 46.8 m² of sealed partition from a single set.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlexible geometry\u003c\/strong\u003e — angle adaptors form dividers, L\/U-shapes and polygons to suit any floor plan.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eClean access\u003c\/strong\u003e — self-adhesive zippers give a resealable pass-through without breaking the seal.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReusable \u0026amp; portable\u003c\/strong\u003e — packs into three transport bags for repeated use across sites.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTypical applications\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003eLarge renovation and restoration sites requiring sealed dust zones\u003c\/li\u003e\n\u003cli\u003eCommercial fit-outs and shop refurbishments in occupied buildings\u003c\/li\u003e\n\u003cli\u003eHazardous-dust containment lines and remediation projects\u003c\/li\u003e\n\u003cli\u003eTemporary partitioning in public-sector and healthcare facilities\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTechnical data\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eMax. wall height:\u003c\/strong\u003e 3.60 m (5 m with extension bars)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMax. wall length:\u003c\/strong\u003e 13 m · \u003cstrong\u003emax. area:\u003c\/strong\u003e 46.8 m²\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackaging:\u003c\/strong\u003e 1500 × 370 × 420 mm · \u003cstrong\u003eweight:\u003c\/strong\u003e 25 kg\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eArticle no.:\u003c\/strong\u003e 1920103\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eOriginal HEYLO equipment (Dantherm Group)\u003c\/strong\u003e — supplied with full manufacturer documentation by BMB Rheinland, your authorised distribution partner.\u003c\/p\u003e\u003cp\u003ePlanning a project or a larger requirement? \u003ca href=\"\/pages\/contact\"\u003eRequest a quote\u003c\/a\u003e.\u003c\/p\u003e\u003chr\u003e\u003ch3\u003eDownloads\u003c\/h3\u003e\u003cul\u003e\u003cli\u003e\u003ca href=\"https:\/\/www.youtube.com\/watch?v=d-Si0feRVj4\" target=\"_blank\"\u003e🎬 Assembly video — HEYWALL dust-protection wall (YouTube)\u003c\/a\u003e\u003c\/li\u003e\u003c\/ul\u003e","brand":"HEYLO","offers":[{"title":"Default Title","offer_id":57799292748120,"sku":"1920103","price":743.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0962\/3932\/1432\/files\/Heylo-HEYWALL-Profi-Paket_2f36eb961623f37d75fa298e9bd01544.webp?v=1784891262"},{"product_id":"heylo-dcd-3-0-staubschutztuer-komplettset","title":"HEYLO DCD 3.0 – Dust Protection Door Complete Set (Door Widths 680–1430 mm)","description":"\u003cdiv style=\"background:#eef4fa;border:2px solid #2a6fb0;padding:12px 16px;border-radius:8px;margin:0 0 20px 0;\"\u003e\u003cp style=\"margin:0;color:#0f1923;\"\u003e\u003cstrong\u003eAvailable to order:\u003c\/strong\u003e typical lead time 5–10 working days. We confirm the exact date after your order or enquiry.\u003c\/p\u003e\u003c\/div\u003e\u003cp\u003eThe \u003cstrong\u003eHEYLO DCD 3.0\u003c\/strong\u003e is a dust-protection access door that lets workers walk in and out of a sealed containment without letting dust escape. It clamps into existing frames without taping and adapts to \u003cstrong\u003edoor widths from 680 to 1430 mm\u003c\/strong\u003e, making it the standard passage for any dust barrier or sheeting partition.\u003c\/p\u003e\u003ch4\u003eWhat's in the set\u003c\/h4\u003e\u003cp\u003eThe DCD 3.0 is a passive containment component — it has no fan of its own. A rigid base element mounts into the doorway with quick-release clamps, and two PVC foils with hook-and-loop fastening form a self-closing, zip-through flap so personnel pass through the barrier while it stays sealed. Two integrated \u003cstrong\u003eØ 205 mm extraction openings\u003c\/strong\u003e let you connect a HEYLO PowerVent fan or PowerFilter air cleaner: extract dust at source into class-M dust bags, or draw the zone to negative pressure with HEPA filtration for hazardous-substance and mould work.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003eBase door element (door widths 680–830 mm)\u003c\/li\u003e\n\u003cli\u003e4 door adaptors (extends to 1430 mm total width)\u003c\/li\u003e\n\u003cli\u003e2 PVC foils with hook-and-loop fastening\u003c\/li\u003e\n\u003cli\u003e1 transport bag\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eKey benefits\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eTape-free mounting\u003c\/strong\u003e — quick-release clamps fix the door into existing frames in seconds and remove without residue.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWide adjustment range\u003c\/strong\u003e — four adaptors cover door widths from 680 to 1430 mm from one set.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSealed pass-through\u003c\/strong\u003e — hook-and-loop PVC foils keep the barrier closed while people and materials move through.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSystem-ready extraction\u003c\/strong\u003e — two Ø 205 mm ports connect PowerVent fans or PowerFilter cleaners for source extraction or negative pressure.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePortable\u003c\/strong\u003e — packs into a single transport bag for fast redeployment.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTypical applications\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003eDust-tight door sealing during renovation and restoration\u003c\/li\u003e\n\u003cli\u003eMould and hazardous-substance remediation with negative-pressure zoning\u003c\/li\u003e\n\u003cli\u003eAccess control into sealed containment areas on occupied sites\u003c\/li\u003e\n\u003cli\u003ePublic-sector and commercial refurbishment in live buildings\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTechnical data\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eBase element:\u003c\/strong\u003e 680–830 × 300 × 81 mm\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eExtraction openings:\u003c\/strong\u003e 2 × Ø 205 mm\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWeight (set):\u003c\/strong\u003e approx. 17 kg\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCompatible units:\u003c\/strong\u003e HEYLO PowerVent fans, PowerFilter air cleaners (M\/H filtration)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eArticle no.:\u003c\/strong\u003e 1110973\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eOriginal HEYLO equipment (Dantherm Group)\u003c\/strong\u003e — supplied with full manufacturer documentation by BMB Rheinland, your authorised distribution partner.\u003c\/p\u003e\u003cp\u003ePlanning a project or a larger requirement? \u003ca href=\"\/pages\/contact\"\u003eRequest a quote\u003c\/a\u003e.\u003c\/p\u003e","brand":"HEYLO","offers":[{"title":"Default Title","offer_id":57799292780888,"sku":"1110973","price":731.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0962\/3932\/1432\/files\/Heylo-Staubschutzt_C3_BCr-DCD-3.0_2f36eb961623f37d75fa298e9bd01544.webp?v=1784891262"},{"product_id":"heylo-dcs-pv-3000-staubschutz-komplettsystem","title":"HEYLO DCS-PV 3000 – Complete Dust Protection System with PowerVent 3000 Fan (3,102 m³\/h)","description":"\u003cdiv style=\"background:#eef4fa;border:2px solid #2a6fb0;padding:12px 16px;border-radius:8px;margin:0 0 20px 0;\"\u003e\u003cp style=\"margin:0;color:#0f1923;\"\u003e\u003cstrong\u003eAvailable to order:\u003c\/strong\u003e typical lead time 5–10 working days. We confirm the exact date after your order or enquiry.\u003c\/p\u003e\u003c\/div\u003e\u003cp\u003eThe \u003cstrong\u003eHEYLO DCS-PV 3000\u003c\/strong\u003e is a complete dust-extraction system that pairs the DCD 3.0 dust-protection door with the high-volume \u003cstrong\u003ePowerVent 3000 axial fan (3,102 m³\/h)\u003c\/strong\u003e. It captures dust-laden air at the source and moves it out of the work zone, keeping adjacent rooms clean during heavy dust work.\u003c\/p\u003e\u003ch4\u003eHow it works\u003c\/h4\u003e\u003cp\u003eThe DCD 3.0 door seals the doorway into the work area. The PowerVent 3000 axial air-mover then draws the dusty air from that sealed zone and pushes it through the 305 mm hose into a class-M dust bag, so airborne dust is captured before it can spread. Because the fan continuously ventilates and displaces the air inside the containment, the room stays under controlled air exchange rather than letting dust settle across the building.\u003c\/p\u003e\u003ch4\u003eWhat's in the set\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003eDCD 3.0 door base element + 2 PVC foils with hook-and-loop + transport bag\u003c\/li\u003e\n\u003cli\u003ePowerVent 3000 axial fan\u003c\/li\u003e\n\u003cli\u003eDust bag (dust class M) + fastening clip\u003c\/li\u003e\n\u003cli\u003eAir hose 7.6 m (Ø 305 mm) + hose adaptor\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eKey benefits\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eHigh extraction rate\u003c\/strong\u003e — 3,102 m³\/h axial airflow clears heavy dust loads quickly.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSource capture\u003c\/strong\u003e — dust-laden air is bagged in class-M filtration before it spreads.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete kit\u003c\/strong\u003e — door, fan, hose and dust bag ship together, ready to deploy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReach \u0026amp; flexibility\u003c\/strong\u003e — Ø 305 mm hose extends up to 5 × 7.6 m for distant work faces.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRobust build\u003c\/strong\u003e — IP44-rated fan for demanding site conditions.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTypical applications\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003eDust extraction during renovation and demolition preparation\u003c\/li\u003e\n\u003cli\u003eChasing, drilling and cutting work with high dust output\u003c\/li\u003e\n\u003cli\u003eRestoration sites needing continuous air displacement\u003c\/li\u003e\n\u003cli\u003eOccupied buildings where adjacent areas must stay clean\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTechnical data\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eAirflow:\u003c\/strong\u003e max. 3,102 m³\/h · \u003cstrong\u003epressure:\u003c\/strong\u003e 501 Pa\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePower:\u003c\/strong\u003e 0.62 kW · 230 V, 50 Hz · 2.89 A · IP44\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSound level:\u003c\/strong\u003e 78 dB(A)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHose:\u003c\/strong\u003e Ø 305 mm, extendable up to 5 × 7.6 m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSystem dimensions:\u003c\/strong\u003e 800 × 600 × 1250 mm · \u003cstrong\u003eweight:\u003c\/strong\u003e 35 kg\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eArticle no.:\u003c\/strong\u003e 1110873\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eOriginal HEYLO equipment (Dantherm Group)\u003c\/strong\u003e — supplied with full manufacturer documentation by BMB Rheinland, your authorised distribution partner.\u003c\/p\u003e\u003cp\u003ePlanning a project or a larger requirement? \u003ca href=\"\/pages\/contact\"\u003eRequest a quote\u003c\/a\u003e.\u003c\/p\u003e\u003chr\u003e\u003ch3\u003eDownloads\u003c\/h3\u003e\u003cul\u003e\u003cli\u003e\u003ca href=\"https:\/\/danthermpublicfiles.blob.core.windows.net\/en-heylo-manuals\/Heylo-PV3000-Bedienungsanleitung-1110814-DE-EN.pdf\" target=\"_blank\"\u003e📄 Operating Manual — PowerVent 3000 (EN\/DE)\u003c\/a\u003e\u003c\/li\u003e\u003c\/ul\u003e","brand":"HEYLO","offers":[{"title":"Default Title","offer_id":57799298056536,"sku":"1110873","price":1460.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0962\/3932\/1432\/files\/Heylo-Staubschutzsystem-DCS-PV-3000_2f36eb961623f37d75fa298e9bd01544.webp?v=1784891262"},{"product_id":"heylo-dcs-pf-1000-staubschutz-komplettsystem","title":"HEYLO DCS PF 1000 – Complete Negative-Pressure Dust Protection System (917 m³\/h)","description":"\u003cdiv style=\"background:#eef4fa;border:2px solid #2a6fb0;padding:12px 16px;border-radius:8px;margin:0 0 20px 0;\"\u003e\u003cp style=\"margin:0;color:#0f1923;\"\u003e\u003cstrong\u003eAvailable to order:\u003c\/strong\u003e typical lead time 5–10 working days. We confirm the exact date after your order or enquiry.\u003c\/p\u003e\u003c\/div\u003e\u003cp\u003eThe \u003cstrong\u003eHEYLO DCS PF 1000\u003c\/strong\u003e is a complete negative-pressure containment system that pairs the DCD 3.0 dust-protection door with the \u003cstrong\u003ePowerFilter 1000 air cleaner (917 m³\/h)\u003c\/strong\u003e. It holds the work zone below the surrounding air pressure so fine dust cannot escape to occupied areas — the standard approach for controlled remediation.\u003c\/p\u003e\u003ch4\u003eHow it works\u003c\/h4\u003e\u003cp\u003eThe PowerFilter 1000 stands in the clean area and continuously extracts air from the sealed work zone through the DCD 3.0 door. Because more air is drawn out than can leak back in, the zone is held at \u003cstrong\u003enegative pressure (under-pressure)\u003c\/strong\u003e — every gap draws inward, so airborne dust stays inside the containment. The extracted air passes a coarse pre-filter and an F9 fine-dust main filter (dust class M) before being returned clean; fitting the optional \u003cstrong\u003eHEPA H14 (class H)\u003c\/strong\u003e filter cleans the air to the standard required for mould and hazardous-substance work.\u003c\/p\u003e\u003ch4\u003eWhat's in the set\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003eDCD 3.0 door base element + 2 PVC foils + transport bag\u003c\/li\u003e\n\u003cli\u003ePowerFilter 1000 air cleaner\u003c\/li\u003e\n\u003cli\u003eCoarse-dust pre-filter + F9 fine-dust main filter (dust class M)\u003c\/li\u003e\n\u003cli\u003eAir hose 7.6 m (Ø 205 mm)\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eKey benefits\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eTrue negative pressure\u003c\/strong\u003e — keeps fine dust locked inside the work zone, protecting adjacent rooms.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHEPA-upgradeable\u003c\/strong\u003e — swap to H14 (class H) for mould and hazardous-substance remediation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTwo-stage filtration\u003c\/strong\u003e — coarse pre-filter plus F9 main filter protects the fan and extends filter life.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eQuiet operation\u003c\/strong\u003e — ≤ 66 dB(A) at 3 m suits occupied and sensitive environments.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete kit\u003c\/strong\u003e — door, cleaner, filters and hose ship together, ready to run.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTypical applications\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003eNegative-pressure containment during renovation and refurbishment\u003c\/li\u003e\n\u003cli\u003eMould remediation requiring HEPA filtration\u003c\/li\u003e\n\u003cli\u003eHazardous-substance and asbestos-adjacent work zones\u003c\/li\u003e\n\u003cli\u003eOccupied buildings where fine dust must not migrate\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTechnical data\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eAirflow:\u003c\/strong\u003e max. 917 m³\/h · 760 m³\/h with F9 (M) · 515 m³\/h with H14 (H)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePower:\u003c\/strong\u003e 0.185 kW · 230 V · 1.33 A\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSound level:\u003c\/strong\u003e ≤ 66 dB(A) at 3 m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHose connections:\u003c\/strong\u003e Ø 205 mm\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSystem dimensions:\u003c\/strong\u003e 800 × 600 × 1250 mm · \u003cstrong\u003eweight:\u003c\/strong\u003e 35 kg\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eArticle no.:\u003c\/strong\u003e 1110892\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eOriginal HEYLO equipment (Dantherm Group)\u003c\/strong\u003e — supplied with full manufacturer documentation by BMB Rheinland, your authorised distribution partner.\u003c\/p\u003e\u003cp\u003ePlanning a project or a larger requirement? \u003ca href=\"\/pages\/contact\"\u003eRequest a quote\u003c\/a\u003e.\u003c\/p\u003e","brand":"HEYLO","offers":[{"title":"Default Title","offer_id":57799298187608,"sku":"1110892","price":2030.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0962\/3932\/1432\/files\/Heylo-Staubschutzsystem-DCS-PF-1000_2f36eb961623f37d75fa298e9bd01544.webp?v=1784891262"},{"product_id":"heylo-dcs-pf-1400-staubschutz-komplettsystem","title":"HEYLO DCS PF 1400 – Complete Negative-Pressure Dust Protection System (1,010 m³\/h)","description":"\u003cdiv style=\"background:#eef4fa;border:2px solid #2a6fb0;padding:12px 16px;border-radius:8px;margin:0 0 20px 0;\"\u003e\u003cp style=\"margin:0;color:#0f1923;\"\u003e\u003cstrong\u003eAvailable to order:\u003c\/strong\u003e typical lead time 5–10 working days. We confirm the exact date after your order or enquiry.\u003c\/p\u003e\u003c\/div\u003e\u003cp\u003eThe \u003cstrong\u003eHEYLO DCS PF 1400\u003c\/strong\u003e is the higher-airflow negative-pressure containment system: the DCD 3.0 dust-protection door paired with the \u003cstrong\u003ePowerFilter 1400 air cleaner (1,010 m³\/h)\u003c\/strong\u003e. It holds larger work zones below the surrounding air pressure so fine dust cannot escape — with a dual-hose option for bigger rooms.\u003c\/p\u003e\u003ch4\u003eHow it works\u003c\/h4\u003e\u003cp\u003ePlaced in the clean area, the PowerFilter 1400 continuously draws air out of the sealed work zone through the DCD 3.0 door. Extracting more air than can leak back keeps the zone at \u003cstrong\u003enegative pressure (under-pressure)\u003c\/strong\u003e, so every gap pulls inward and airborne dust stays contained. Air passes a G4 pre-filter and an F9 fine-dust main filter (dust class M) before clean return; the optional \u003cstrong\u003eHEPA H14 (class H)\u003c\/strong\u003e filter raises filtration to the standard required for mould and hazardous-substance remediation. A dual-hose configuration increases intake reach in larger rooms.\u003c\/p\u003e\u003ch4\u003eWhat's in the set\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003eDCD 3.0 door base element + 2 PVC foils + transport bag\u003c\/li\u003e\n\u003cli\u003ePowerFilter 1400 air cleaner\u003c\/li\u003e\n\u003cli\u003eG4 coarse-dust pre-filter + F9 fine-dust main filter (dust class M)\u003c\/li\u003e\n\u003cli\u003eIntake connector + air hose 7.6 m (Ø 205 mm) + fastening strap\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eKey benefits\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eHigher airflow\u003c\/strong\u003e — 1,010 m³\/h holds negative pressure across larger containments than the PF 1000.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHEPA-upgradeable\u003c\/strong\u003e — fit H14 (class H) for mould and hazardous-substance work.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDual-hose ready\u003c\/strong\u003e — two-hose intake extends coverage in bigger rooms.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eVery quiet\u003c\/strong\u003e — ≤ 61 dB(A) at 3 m for occupied and noise-sensitive sites.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete kit\u003c\/strong\u003e — door, cleaner, filters, hose and connector ship together, ready to run.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTypical applications\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003eNegative-pressure containment on larger renovation and remediation sites\u003c\/li\u003e\n\u003cli\u003eMould and hazardous-substance work requiring HEPA filtration\u003c\/li\u003e\n\u003cli\u003eMulti-room or high-volume work zones needing extended intake reach\u003c\/li\u003e\n\u003cli\u003eOccupied and noise-sensitive buildings where fine dust must not migrate\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch4\u003eTechnical data\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eAirflow:\u003c\/strong\u003e max. 1,010 m³\/h · 890 m³\/h with F9 (M) · 697 m³\/h with H14 (H)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePower:\u003c\/strong\u003e 0.175 kW · 230 V, 50–60 Hz · 1.17 A\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSound level:\u003c\/strong\u003e ≤ 61 dB(A) at 3 m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHose connections:\u003c\/strong\u003e Ø 205 mm\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSystem dimensions:\u003c\/strong\u003e 800 × 600 × 1250 mm · \u003cstrong\u003eweight:\u003c\/strong\u003e 35 kg\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eArticle no.:\u003c\/strong\u003e 1110874\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eOriginal HEYLO equipment (Dantherm Group)\u003c\/strong\u003e — supplied with full manufacturer documentation by BMB Rheinland, your authorised distribution partner.\u003c\/p\u003e\u003cp\u003ePlanning a project or a larger requirement? \u003ca href=\"\/pages\/contact\"\u003eRequest a quote\u003c\/a\u003e.\u003c\/p\u003e\u003chr\u003e\u003ch3\u003eDownloads\u003c\/h3\u003e\u003cul\u003e\u003cli\u003e\u003ca href=\"https:\/\/danthermpublicfiles.blob.core.windows.net\/en-heylo-manuals\/Heylo-PF1400-Bedienungsanleitung-1110899-DE-EN.pdf\" target=\"_blank\"\u003e📄 Operating Manual — PowerFilter 1400 (EN\/DE)\u003c\/a\u003e\u003c\/li\u003e\u003c\/ul\u003e","brand":"HEYLO","offers":[{"title":"Default Title","offer_id":57799298416984,"sku":"1110874","price":2502.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0962\/3932\/1432\/files\/Heylo-Staubschutzsystem-DCS-PF-1400_2f36eb961623f37d75fa298e9bd01544.webp?v=1784891263"}],"url":"https:\/\/shop.bmbrheinlandgmbh.com\/collections\/staubschutz-abschottung.oembed","provider":"BMB Rheinland GmbH","version":"1.0","type":"link"}